Sign In | Join Free | My insurersguide.com
China HEBEI SOOME PACKAGING MACHINERY CO.,LTD logo
HEBEI SOOME PACKAGING MACHINERY CO.,LTD
TO BE AND BE FOREVER!
Active Member

8 Years

Home > Thin Blade Slitter Scorer Machine >

Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc

HEBEI SOOME PACKAGING MACHINERY CO.,LTD
Contact Now

Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc

Brand Name : SOOME

Model Number : SMBD-BNC

Certification : CE

Place of Origin : Made In China Hebei

MOQ : 1Set

Price : Contact

Payment Terms : L/C, T/T

Supply Ability : 20 Pcs/month

Delivery Time : 45 Days /30 Days

Packaging Details : Wooden case or plastic film;LCL or 20' Container

Speed : 150,200,250m/min

Blade&scorer : 5&8,6&10,7&12

Order change : 1-3s(servo type) 3-8s(invert type)

Precision : ±0.5mm

Min.slitting : 135mm

Min.scorer : 0mm

Correction range : 200mm

Width : 1800mm,2200mm,2500mm

Power : 25kw,30kw,35kw

Contact Now

Computer-controlled,Automatic change order,Precise cutting NC Thin Blade Slitter Scorer

1 . Summarize

Product overview:As an important equipment of corrugated cadres,complete the high quality line of cardboard and precise cutting and the size is very precise.Adopt computer-controlled,automatic change order,and reduce waste,improve work efficiency.

2 . Features

1) High quality touch screen and PLC equipped composing the CNC system,connect to the production line.

2) High quality beeline rail and high-precision screw conveying guarantees the precision.

3) A memory of orders,realize non-stop automatic or manual change.

4) Speed synchronizes with board speed.Standard communication interface,easy to link with management system.

5) Alloyed steel thin-blades,sharp and long life of over 8 million meters,auto sharpening.

6) The knife for computer control automatic or manual knife sharpening,edge trimming knife,improve production efficiency.

7) Three types of scorers:convex to concave(three lines).convex to concave(five lines),convex to flat.

8) Two rows of scorers,realizes minimum scorer spacing is 0mm.

9) Computer control score-depth,high quality scorer,more steady.

10) Using the synchronous belt transmission ,low noise,prolong using time.

11) Standard motorized body left-right rectification system 200mm.

3. Technical index

width 1800mm 2200mm 2500mm
speed 150,200,250m/min
Blade&scorer 5&8,6&10,7&12
Order change

1-3s(servo type)

3-8s(invert type)

precision ±0.5mm
Min.slitting 135mm
Min.scorer 0mm
Correction range

200mm

power

25kw

30kw 35kw
machine size

3900*1800*2450 (mm)

4300*1800*2450(mm) 4500*1800*2450(mm)

Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc


Product Tags:

nc thin blade slitter scorer machine

      

computer controlled thin blade slitter scorer

      

precise cutting thin blade slitter scorer

      
Cheap Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc for sale

Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: HEBEI SOOME PACKAGING MACHINERY CO.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)